Two workers who were buried in the Trishuli 3A hydropower tunnel after last week’s catastrophic flash floods have been rescued alive, officials announced. The pair had been trapped at a depth of about 170 metres for nine days, their survival made possible by a coordinated effort involving the Nepalese army and rescue teams. The tunnel, located in a region hardest hit by the floods that turned the construction site into a river of mud, has been the focus of an ongoing operation to locate and extract the missing personnel. The successful rescue underscores both the severity of the disaster and the determination of responders to recover those still missing.
Officials say pair were rescued from Trishuli 3A hydropower tunnel in Nepal after being trapped in depth of 170 metresTwo people have been pulled out alive from a hydropower tunnel in Nepal nine days after deadly flash floods buried the projects in deep mud and left them trapped.The workers were rescued during an ongoing operation at the Trishuli 3A tunnel, a hydropower project in one of the areas worst affected by last week’s floods, according to the army spokesperson Brig Gen Raja Ram Basnet. Continue reading...